Construction of Specimen with Moment Frame Structure and Spine
Test conducted 2020/12/07
Pre-experiment for create collapse model for buildings with weak beam-strong column
Test conducted 2020/11/30
Image analysis of inner wall and seismic performance of sprinkler
![](http://www.hokudai-str-eng-eng.jpn.org/wp-content/uploads/2020/12/4BCA7B58-2530-4145-B3B2-03363F097F-1024x682.jpg)
Test conducted 2020/11/27
Real size dhake table test for large unit house
Test conducted 2020/11/20
beam-to-column connection with RC slab experiment
![](http://www.hokudai-str-eng-eng.jpn.org/wp-content/uploads/2020/11/20201120-2-683x1024.jpg)
Test series completed 2020/11/19
These are scenes of unit house beam-to-column connection experiment.
Test preparation 2020/11/13
![](http://www.hokudai-str-eng-eng.jpn.org/wp-content/uploads/2020/11/202011132-rotated.jpg)
![](http://www.hokudai-str-eng-eng.jpn.org/wp-content/uploads/2020/11/20201113.jpg)
These are scenes of the preparing of experiments in Tsukuba and Mr.Takahashi’s next test.
We took a picture for the graduation album
![](http://www.hokudai-str-eng-eng.jpn.org/wp-content/uploads/2020/10/アルバム用20201027-1024x768.jpg)
Test conducted 2020/10/19
Mr. Takahashi’s Cyclic loading test of moment resisting connections was conducted.
![](http://www.hokudai-str-eng-eng.jpn.org/wp-content/uploads/2020/10/高橋さん実験 純鉄骨-1024x680.jpg)